British Embassy

Costa Rica
British Embassy
  • Futuris was commissioned by the British Embassy in Costa Rica to carry out an Environmental Impact Assessment (EIA) for the construction of a wall in an adjacent area to a river within the embassy property. The project also included a mitigation action plan and the obtaining of the environmental license from the local competent authority (2009)

 

  • Futuris also served as an environmental regent for the follow up of the project and the progress reporting to the local authority (2009)
HTML Snippets Powered By : XYZScripts.com