The Landfill Comes with a School

El relleno sanitario viene con colegio | Delfino.cr

In the Japanese film Evil Does Not Exist, a company plans to build a glamping resort in a rural community: that glamorous form of camping without the inconveniences of actually camping. During a consultation with local residents, they ask about wastewater management. The facilitators, more familiar with organising events than dealing with environmental issues, explain that the specialists were unable to attend due to scheduling conflicts. The residents, however, did turn up, and they came with plenty of questions.

That scene came to mind as I read Delfino.cr’s report on the community forum held in Turrúcares on 4 November. The subject under discussion was not a glamping resort, but nothing less than a landfill. Rodrigo Chaves, Minister of the Presidency and Finance, arrived accompanied by the Ministers of Education, Public Works and Transport, and Health. Quite a display of government officials for a community meeting.

Behind that meeting lay a conflict that has been ongoing for years. In 2011, the Municipality of Alajuela granted land-use permits for a landfill in Bajo Pita, promoted by the waste management company EBI. Subsequently, the municipality itself went to court to challenge those permits. The company initiated international arbitration proceedings against Costa Rica, seeking substantial compensation. The Government is now attempting to find a way out: that the municipality withdraw its legal actions and that EBI abandon its international claim.

Government representatives arrived with an enticing offer: a technical secondary school, bridges, roads and childcare centres. There was, however, a condition attached. The municipality had to withdraw its legal claims. Moreover, as with the best commercial promotions, the offer came with an expiry date: before the Ministry of Finance paid for Costa Rica’s legal defence in the arbitration proceedings. After that, the promotion would be over.

Even when the Minister of Education suggested considering the purchase of the land for the school, Chaves asked him to wait for the municipality’s decision. First the landfill, then the school. An unusual way to set educational priorities.

There were ministers present to discuss schools, roads and healthcare, but the Minister of Environment was absent. A striking omission, given that the issue at hand was a landfill. The residents, meanwhile, had questions. They asked about springs, wells, the biological corridor and the refuse lorries that would travel through their communities. Yet nobody had arrived prepared to answer those questions in detail. Anyone willing to do the research can find some answers in the project studies. But that does not absolve the authorities of their responsibility to explain them to local residents.

The National Environmental Technical Secretariat (SETENA), part of the Ministry of Environment and Energy (MINAE), granted environmental approval in 2016, which was reinstated in 2018. One of the analyses cited in that resolution warned that excavation works would increase the vulnerability of groundwater to contamination from low to moderate.

The National Groundwater, Irrigation and Drainage Service (SENARA) considered it feasible to develop the project, but only subject to the implementation of measures to prevent contaminants from the landfill reaching groundwater resources. Water protection will therefore depend not only on what is designed, but also on how the landfill is constructed, operated and monitored over the coming decades.

And here it matters who will be in charge. According to reports by La Nación and Semanario Universidad, EBI has faced problems at other facilities across the country involving contamination, waste slides and operational deficiencies. What guarantees are there that those problems will not be repeated in Turrúcares?

No one wants a landfill next door to their home. Before asking a community to accept one, EBI and the environmental authorities must provide clear answers regarding the risks, the protection measures and the monitoring of its operation. It is not enough to promise that the facility will be run in accordance with good practice; they must demonstrate how those standards will be achieved.

While those questions remain unanswered, the Government is offering bridges and a school. They are undoubtedly worthwhile projects, but they should respond to the community’s needs, not be used to secure the withdrawal of legal challenges. Nor do they alter the permeability of the rocks, groundwater flow or the possibility of groundwater contamination. Geology, unfortunately for the negotiators, does not accept public infrastructure projects as a form of payment.